RMG was engaged to complete the detailed design of the Rushworth Streetscape Project. RMG provided civil engineering services to design the streetscape in accordance with Campaspe Shire Council and Department of Transport & Planning (DoTP) requirements.
Project works included:
- Stage 1 – Footpath and kerb works on the western side of High Street from Wigg Street to Bendigo Bank
- Stage 2 – Footpath and kerb works on the western side of High Street from Bendigo Bank to the north side of the Railway Line
- Stage 3 – Footpath and kerb works on the western side of High Street from the north side of the Railway Line to Moora Road
- Stage 4 – Road pavement works on the western side of High Street
- Stage 5 – Footpath and kerb works on the eastern side of High Street adjacent to the Post Office
- Stage 6 – Road pavement works on the eastern side of High Street.